Main Content
29-Oct-2020 The Eppenberg tunnel, equipped with the rigid overhead conductor bar system (ROCS) from ... read on Successful commissioning of the Eppenberg tunnel
19-Oct-2020 In the route network of Aargau Verkehr AG (AVA) the return conductor cable was still missing ... read on Rolling out the return conductor cable
30-Jul-2020 Network Rail's maintenance teams were trained by our UK staff in the maintenance of the ... read on F+F GB organizes a training on ROCS
16-Jun-2020 Over the course of two weeks, a temporary overhead contact line was installed in the Aarau Süd ... read on AVA, preparing the new train station in Aarau
28-May-2020 A helicopter was used for the total renovation of the OLE between Flamatt and Laupen. Within two ... read on Helicopter operation between Flamatt and Laupen
12-May-2020 In the single-track, 15.4 km long Ceneri Base Tunnel, high speed tests have been running since ... read on 275 km/h in Ceneri Base Tunnel
08-Apr-2020 The Böblingen maintenance hall and depot of Schönbuchbahn, which Furrer+Frey equipped as part of ... read on Böblingen, Depot and Workshop
20-Mar-2020 We take all measures to ensure that our projects can be carried out and that the construction ... read on Business Continuity
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - Open-Source Java Content Management