Main Content
15-Feb-2019 The new Depot in Saignelégier is in Service. F+F have designed and installed the OLE inside and ... read on New depot in Saignelégier
14-Feb-2019 The high voltage test rig in the rolling stock Workshop in Biel has been commissioned ... read on Test site in Biel Workshop
31-Jan-2019 Furrer+Frey have equipped the Wiesbaden Workshop with overhead contact lines, comprising ... read on Wiesbaden Workshop
28-Jan-2019 Successful commissioning of the ROCS installation on the RBS line with its crossovers along ... read on RBS, Berne. ROCS commissioned
21-Jan-2019 F+F retractable conductor rail on four inspection bays in DMRC's Kalindi Kunj Depot read on DMRC Kalindi Kunj Depot
14-Jan-2019 ROCS has been installed between the two tunnels Patchway Short and Patchway Old. Surplus masts ... read on ROCS between Tunnels
14-Dec-2018 DB have authorized Furrer+Frey Deutschland for OLE and ROCS design works. read on F+F prequalified by DB
09-Dec-2018 With the aid of the Conductor Bar Lifter, 1.8 km of Overhead Conductor Rail bars have been ... read on Fitting ROCS with Conductor Bar Lifter
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - intuitive Content Management Software