A new element (Pat. pending) allows the direct transition from twin contact wire to conductor rail. The picture shows an application on the German mouth of Buschtunnel.
A new element (Pat. pending) allows the direct transition from twin contact wire to conductor rail. The picture shows an application on the German mouth of Buschtunnel.
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - SEO-friendly CMS