The new Depot in Saignelégier is in Service. F+F have designed and installed the OLE inside and in front of the building as well as delivered the control System for isolation and earthing equipment.
The new Depot in Saignelégier is in Service. F+F have designed and installed the OLE inside and in front of the building as well as delivered the control System for isolation and earthing equipment.
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013