ROCS has been installed between the two tunnels Patchway Short and Patchway Old. Surplus masts from the Great Western Electrification could be used.
ROCS has been installed between the two tunnels Patchway Short and Patchway Old. Surplus masts from the Great Western Electrification could be used.
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013