The installation of the Conductor rail in the first portion of the Depot Santa Anita (Etapa1A) has been completed in the open track (approx. 5 km) and inside the building (6 tracks of CRM 6 x 130 m). The Commissioning and tests of the line have been done in September 2019 and after the approval Hitachi Rail has started to use the line for the moving and tests of the Rolling Stock.