Client: AlpTransit Gotthard
Project name: Ceneri Base Tunnel
Partner(s): –
Year of completion: 2020
Furrer+Frey was responsible for the planning and supply of materials for the overhead contact line systems for the Ceneri Base Tunnel. The outdoor system was equipped with the SBB R2+ overhead contact line, while Furrer+Frey’s rigid overhead conductor rail system (ROCS) was used in the tunnel. The planning process was carried out using our ELFF ROCS tool.
