Main Content
01-Jan-2013 Under the name Furrer+Frey Electrification (Guangzhou) Limited our new offices in Guangzhou, ... read on Furrer+Frey Guangzhou
09-Dec-2012 On December 9 ÖBB's Lainzer Tunnel opened for regular traffic. Already in July, ÖBB ... read on ÖBB's Lainzer Tunnel open
07-Dec-2012 Commissioning of the pivoting conductor bar in MGB's depot at Glisergrund is complete. read on MGB Depot complete
22-Nov-2012 F+F designed and built the control and interlocking system for SBB's Train washing plant in ... read on SBB train washing plant
13-Nov-2012 Already in July 2012 the conventional contact line has been replaced by a conductor bar, ... read on Tunnel Landikon stabilisation
02-Nov-2012 Furrer+Frey GB Ltd has moved to its new office in London. read on Furrer+Frey GB Ltd
18-Sep-2012 Also in 2012 F+F was present at Innotrans in Berlin: read on Innotrans 2012
13-Sep-2012 ÖBB have approved Furrer+Frey's Dynamic Catenary Measuring System DCM for the measurement ... read on ÖBB approval
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - Open-Source Java CMS