Main Content
22-Feb-2009 For the Tram in Bordeaux, Cegelec has equipped two Swivel Bridges with Furrer+Frey Conductor Rails. read on Bordeaux Swivel Bridge
28-Jan-2009 As before, also this year Furrer+Frey organised a training course for plant conductors together ... read on Plant Conductor Training
25-Jan-2009 The first portals on the Great Eastern Route are being replaced by Swiss Design Booms. read on GE uses Swiss Portals
07-Jan-2009 The mock-uo installation of GEFF overhead contact line system for the Great Eastern Route has ... read on Rainham GEFF Mockup
01-Jan-2009 Also on red-letter days our on-call-service is at your disposal. On 26.12.2008 Ferdinand ... read on On-Call Service
13-Dec-2008 Section 1A2 of Glatttalbahn has opened for regular service. read on Glatttalbahn Opening
28-Nov-2008 While inserting the contact wire into the conductor rail, grease is applied to the grooves to ... read on Contact Wire Grease Appliance
27-Nov-2008 Over one of the tracks in the Brig Train Shed the overhead contact line is mounted at maximum ... read on Brig Train Shed
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - Intuitive Web Content Management System