After removal of the cross spans, the extra wide central sections of the two portals was lowered to the height of the end sections.
After removal of the cross spans, the extra wide central sections of the two portals was lowered to the height of the end sections.
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013