Berhau Tunnel was renovated in 2006. A moveable conductor rail had been installed to facilitate the works (see news 2006). Now the tunnel is finished, and the final conductor rail is installed.
Berhau Tunnel was renovated in 2006. A moveable conductor rail had been installed to facilitate the works (see news 2006). Now the tunnel is finished, and the final conductor rail is installed.
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - Intuitive Opensource CMS