The two tracks on the right hand side have been equipped with the new automatically tensioned GEFF Overhead Contact Line. On the left, the old Fixed Termination OLE is still in place.
The two tracks on the right hand side have been equipped with the new automatically tensioned GEFF Overhead Contact Line. On the left, the old Fixed Termination OLE is still in place.
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - based on JSR-170