For the renovation of a highway overbridge near Sargans a sub-structure had to be built. By replacing the overhead contact line by a conductor rail the necessary space could be freed.
For the renovation of a highway overbridge near Sargans a sub-structure had to be built. By replacing the overhead contact line by a conductor rail the necessary space could be freed.
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - Open-Source Java CMS