In the long Christmas Possession, a new heavy Anchor Boom was installed on the Great Eastern Line.
In the long Christmas Possession, a new heavy Anchor Boom was installed on the Great Eastern Line.
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013