Load Test to check voltage drop with one rectifier shut down (n-1). Worst case conditions with maximum load of four Tram 2000 on the longest antenna to Stettbach.
Load Test to check voltage drop with one rectifier shut down (n-1). Worst case conditions with maximum load of four Tram 2000 on the longest antenna to Stettbach.
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - Java Open-Source CMS