the first tubbing segments are being installed

Renovating Glatscheras tunnel is a pilot project for the new standard reconstruction method for RhB tunnels.

In view of the installation of protecting hoods a conductor bar has been installed at the tunnel entrance. Then, the hoods were placed over the conductor bar, preventing the track from falling rocks during the works.