Client: ÖBB
Project name: TS hall, Simmering (Austria)
Partner(s): –
Year of completion: 2022
We supplied a retractable rigid overhead conductor rail for two test voltage tracks at the TS hall, Simmering. This challenging project involved supplying the conductor rail with both 15 kV AC and 3 kV DC, with the voltages being supplied at different end positions of the conductor rail. In addition, mechanical disconnection of the power supply was included for the event that the end position is not reached during the swivelling process.