Main Content
27-Apr-2017 We reached the first milestone in the Limmattalbahn (LTP) project during the sampling of the ... read on 1st milestone in the Limmattalbahn project
24-Apr-2017 DCM 1.0 on the high speed line between Nîmes and Montpellier, recording contact wire height and ... read on DCM on the LGV CNM Nîmes-Montpellier
20-Apr-2017 The historic wooden poles on the MIB line between Meiringen and Innertkirchen are being replaced. read on Replacement of historic wooden poles
13-Apr-2017 One of the two tracks in Wolf tunnel on the line Basel - Delémont is restored and equipped with ... read on Half of Wolf tunnel is restored
05-Apr-2017 Launch of a White Paper for Developping Sustainable, Agile, Mutlimodal Transport solutions for ... read on White Paper for Wales
24-Mar-2017 The pilot is working. read on All in One-Charging station
24-Mar-2017 An especially long boom has been installed in Winterthur. Type J140, length 44.5 m! read on 44.5 meters!
10-Mar-2017 The first place goes to the Company Heiniger. Furrer+Frey is fourth and receives a special ... read on Special distinction for F+F
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - Intuitive Content Management Tool