Main Content
24-Nov-2017 F+F and e-mobility read on e-mobility
06-Oct-2017 F+F's contribution: Single Insulator Cantilever (SIC) Rigid Overhead Conductor-rail System read on F+F at IREE in New Delhi
28-Aug-2017 The Eigerplatz and ist Overhead contact lines have been completely renovated. read on The new Eigerplatz in Bern
28-Aug-2017 The depot in Innertkirchen is equipped with an overhead conductor rail. For works on the roofs ... read on Overhead conductor rail at the depot of MIB
07-Aug-2017 SBB have replaced the OLE on the 16km long line between Frauenfeld and Weinfelden. Furrer+Frey ... read on Assistance to SBB OLE works
23-Jun-2017 Furrer+Frey was awarded the reconstruction of the Taucha railway station and the track section ... read on Taucha train station; upgrade
22-Jun-2017 The first TTC (two track cantilever) has been installed on a sectionning point at SOB (Schweizer ... read on First TTC in Switzerland
29-May-2017 The MTW100 is for the first time in action at the SBB-construction site in Aigle-St. Triphon. ... read on MTW100 at work in Aigle-St. Triphon
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - Intuitive Website Content Management System