Main Content
16-Nov-2018 SUVA has approved the new Conductor Bar Lifter. It is now ready for use at the renovation of the ... read on Conductor Bar Lifter
07-Nov-2018 The new tractor Tmf 2/2, equipped with a radio control, disposes of adaptable couplers and brake ... read on Narrow Gauge All-rounder
07-Oct-2018 This weekend saw the successful commissioning of Bristol Parkway Electrification following the ... read on Bristol Parkway
18-Sep-2018 Our first lightweight aluminum cantilever (FL200 light) were installed on Tyne and Wear Metro ... read on lightweight cantilevers
18-Sep-2018 Our OLE design tool can now be used in the cloud. See a demo-version at InnoTrans. read on Demo 3D model
31-Jul-2018 The first masts of Limmattalbahn have been installed in Schlieren. Ernst Autotransport AG ... read on Limmattal, first masts up
23-Jul-2018 The overhead contact lines have been temporarily dismantled for the refurbishment of the ... read on Kirchenfeldbrücke
18-Jun-2018 The exhibition will take place from September 18 to 21, 2018 in Berlin. You will find us at two ... read on F+F at InnoTrans 2018
Ingenieurbüro, Fahrleitungsbau
Thunstrasse 35
Postfach 182
3000 Bern 6
Schweiz
© Furrer+Frey AG 2013
Powered by Magnolia - Intuitive Web CMS